Abstract
Abstract Reservoir operation charts have been widely researched and applied to reservoir operation. However, these achievements are generally used for a single reservoir and have rarely been applied to cascade reservoirs. Considering the requirements of flood control and water supply, this paper studied the extraction and application of energy storage operation chart (ESOC) for cascade reservoirs. Steps in the methodology mainly include: (1) model building of cascade reservoirs operation optimization (CROO), (2) extracting ESOC based on discriminant coefficient method (DCM) and CROO model, (3) simulation operation of ESOC based on DCM, (4) choosing the optimal ESOC and verifying its efficiency through the results. Cascade reservoirs in the Yangtze River of China were selected for a case study. Compared with the conventional operation method, the simulation results show that the ESOC presents better performance in terms of power generation, guaranteed output and assurance rate. In detail, the annual power generation of ESOC can be increased by 0.9%, the total guaranteed output can be increased by 3.4% and the assurance rate can be increased by 9.6%, which indicates that the proposed ESOC method can greatly improve the hydropower energy efficiency and reliability of cascade reservoirs’ power supply.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.