Abstract

The purpose of the paper is to determine the applicability of external setup preparation activities of Single Minute Exchange of Die (SMED) in reducing setup time. Improving the external setup preparation of SMED leads a better and effective working performance. To improve the effectiveness of the external setup in SMED, it is concerned particularly with changing the internal activities into external activities and improving the current external activities. The process failure mode and effect analysis (PFMEA) adopted to analyze the problem faced of external set up process.The verification of the methods is done by an application a plastic injection molding manufacturing process where setup times are critical for time reduction.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call