Abstract

In recent years, there was a rapid development of wind power. The impact of large amount of wind power integration into power system on the voltage and power quality could not be ignored. The characteristic of internal dynamics of wind turbine was complicated, as a result, it could not be simulated by electromechanical transient simulation soft (BPA). It was necessary for transformation from BPA to PSCAD which was electromagnetic transient simulation program. However, the modeling work for the external power grid was enormous and meaningless. In this paper, external network was equivalent based on the BPA data of actual grid combined with PSCAD. This method not only could simulate the influence both simple and effective, but also could establish the detailed model of the regional power grid and wind power. At the same time it has been effectively used in the analysis of wind power integration into actual wind projects of Fujian power grid which achieved very good results.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.