The safety of the nuclear power plant depends on the availability of the continuous and reliable sources of electrical energy during all modes of operation of the plant. The station blackout corresponds to a total loss of all alternate current (AC) power as a result of complete failure of both offsite and on-site AC power sources. The electricity for the essential systems during station blackout is provided from the batteries installed in the nuclear power plant. The results of the probabilistic safety assessment show that station blackout is one of the main and frequently the dominant contributor to the core damage frequency. The accident in Fukushima Daiichi nuclear power plants demonstrates the vulnerability of the currently operating nuclear power plants during the extended station blackout events.The objective of this paper is, considering the identified importance of the station blackout initiating event, to assess the implications of the strengthening of the SBO mitigation capability on safety of the NPP. The assessment is done with state-of-art deterministic and probabilistic methods and tolls with application on reference models of nuclear power plants.The U.S. NRC Station Blackout Rule describes procedure for the assessment of the size and capacity of the batteries in the nuclear power plant. The description of the procedure with the application on the reference plant and identified deficiencies in the procedure is presented.The safety analysis is done on reference model of the nuclear power plant. Obtained results show large decrease of the core damage frequency with strengthening of the station blackout mitigation capability. The time extension of blackout coping capability results in the delay of the core heat up for at least the extension time interval. Availability and operation of the steam driven auxiliary feedwater system maintains core integrity up to 72h after the successful shutdown, even in the presence of the reactor coolant pumps seal leakage. The largest weighted decrease of the core damage frequency considering the costs for the modification is obtained for the modification resulting in extension of the station blackout coping capability. The importance of the common cause failures of the emergency diesel generators for the obtained decrease of the core damage frequency and overall safety of the plant is identified in the obtained results.The results of the analysis support the latest recommendations and expected revisions to the corresponding regulatory requirement by the U.S. Regulatory Commission considering the station blackout mitigation capability.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.