Abstract

Precedence Network model that permits 2 kinds of time-lag values as well as 4 kinds of relations has been developed for removing the inconvenience of PERT on representing the precedence relations between activities of a project.This PN/Time model has improved as PN/Manpower model with interactive procedure, which is one of heuristic scheduling models under resource constraints.PN/Manpower model has been extended to PN/Man·Eday model that eliminates the dissatisfaction of PN/Manpower on the assignment of required resources to activities, and also combined with the estimation system for examining the master schedule of a project.All models proposed in this paper have been programmed by BASIC for micro-computer system on construction job-sites.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.