Abstract

Partial denitrification (PD) is another important pathway producing nitrite for anammox, however, whether its performance is affected by overlong reaction time, a situation that often takes place is still unknown. Three sequencing batch reactors were operated for PD to evaluate this factor on nitrite production. Results indicated effluent nitrite was very close despite reaction time even extending to four times longer than control (i.e., nitrate-to-nitrite transformation ratio (NTR) of 94.4%-89.8%). Meanwhile, it was found PD could recover to the normal after suffering from high organics shocking. Cycle studies suggested produced nitrite would not be further reduced with prolonged time, as indicated by changing trend of pH and alkalinity. Microbial analysis revealed PD functional bacteria, Thauera, slightly decreased with prolonged reaction, while it was always predominated. Taken together, this study indicated overlong reaction time had minor influence on PD, demonstrating its robustness with great technological superiority in supplying nitrite for anammox.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.