Abstract
Simulation modelling has been utilised as a decision-support tool for different production systems. However, simulation uptake in construction is lagging due to several challenges such as the extensive data requirements and modelling efforts in a simulation study. This paper aims at addressing this gap by introducing a framework that integrates the practices of simulation modelling with the Last Planner® System (LPS), which is a well-established production planning and control method. The framework focuses on exploiting the outputs of implementing the LPS to support building a valid simulation model. A case study is conducted to test the applicability of the proposed framework. Based on the findings of the study, it can be concluded that the LPS provides a promising avenue for integration with simulation modelling due to the shared processes and requirements between both methods, which may lead to minimised data requirements and modelling efforts for simulation, thus improving simulation uptake in the construction industry.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.