Abstract
The Gaza Strip’s construction industry in Palestine is suffering from the existence of unreliable production plans with great variability. One of the innovative solutions to avoid, eliminate or at least reduce plan variation is the adoption of last planner system (LPS). This research highlights the importance of eliminating plan variation in the production planning and control process in Gaza Strip as a key improvement in the delivery process of construction projects through the use of LPS. This research applies a survey strategy that uses two data collection methods, including questionnaire and interview. The results show that several elements of LPS already exist in Gaza Strip. Nevertheless, these elements do not follow the same approach of LPS. The main challenge is the involvement of many subcontractors. The primary variation cause is the unavailability of materials. The critical success factor is the top management support.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.