Abstract
The article investigates the differentiation of business processes in contemporary organisations based on their dynamics (predictability). It presents and summarises research on the nature of business processes in Industry 4.0/5.0 conducted by researchers from 7 Polish universities. The study combines a systematic literature review based on the SCOPUS database and a survey of 466 respondents with an analysis of 12,573 processes. Filling the cognitive gap in Industry 4.0/5.0 organisations, the study reveals that nearly 60% of all BPs are semi-structured processes. At the same time, it shows a strong relationship between the importance of processes for the organisation and the dynamics of their execution. This finding highlights the importance of adaptability and flexibility in organisational dynamics, reflecting the nuanced nature of most BPs. The article presents original research on a diverse sample of Polish enterprises based on the simplified Business Processes Nature Assessment Framework. The presented research results indicate the need to update the essential elements of the BPM concept, such as BPM Lifecycle, BPM implementation method, or BPM maturity assessment, to consider various assessment criteria and implementation methods depending on the nature of BPs. The study contributes to advancing both theoretical knowledge and practical applications in the field of BPM, providing valuable insights for scholars, practitioners, and policymakers alike.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.