Abstract

The safety of Tongluoshan Tunnel construction and permanent structure , in the 6th light rail line in Chongqing City, is seriously interfered with coal mining area collapsed. Some characters of the goaf, such as the position, scale, groundwater and filling characteristics, had been probe by Ground Penetrating Radar. And then some measures had been taken, such as pipe roof ahead of support, sealers goaf filling pore grouting reinforcement. After disposal in accordance with the monitoring Data of the dynamic adjustment of the support program and to ensure construction safety, and proved the validity of the aforementioned prediction and disposal techniques similar goaf treatment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.