Abstract

The development of rail transit and the construction above subway station (CASS) will have profound influence on city. This paper tries to take Tianjin’s practical situation into consideration, and after analyzing the theories and CASS in and abroad, attempts to find objective law between rail transit and urban development in Tianjin from the interaction of M1 (Metro 1 of Tianjin subway system) construction and urban development. Base on the existing problems and experience, this paper puts forward the methods of exploitation above subway station and the qualitative indicators. Then take an under construction station’s exploitation as an example, raising qualitative principles and quantitative indicators to the site construction nearby. By doing this, aim at leading the future CASS and realizing the harmonious interaction between the development of urban rail transit and land use above it.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call