Abstract
Shield tunnels have been widely used in city metros all over the world. During the long-term period of the metro operation, the joints of shield tunnel’s neighboring segments may degrade due to some environmental factors, leading to the increasing of the joint opening and some resulting adverse consequences. In this paper, a temporary strengthening method by using shape memory alloy (SMA) bolts is proposed and experimentally studied for the joints of neighboring segments, and a revised electric heating method which suits with the strengthening method is presented and experimentally validated for the SMA bolts. The purpose of the proposed temporary strengthening method is to create favorable conditions for the following permanent strengthening. Test results show that: (a) for the joints of shield tunnel’s neighboring segments, the strengthening method can effectively reduce the joint opening, joint deflection, concrete strain in joint’s compression zone, and strain of joint’s steel bolts; (b) the revised electric heating method can be used to heat the SMA rod to a temperature higher than the SMA’s austenite finish temperature quickly, and the average heating rate related to Type 2 inner resistance element is larger than that related to Type 1 inner resistance element; and (c) the reduction percentages of the joint opening increment, joint deflection, concrete strain in joint’s compression zone, and strain of joint’s steel bolts for Specimen I are all larger than those for Specimen II, implying that the less the joint opening is, the more significant the strengthening effect is.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have