Abstract

Abstract In this study, in order to examine the impact properties of a stainless steel reinforced concrete bridge pier under the conditions of horizontal impact load effects, a multifunction ultrahigh heavy drop hammer impact test system was utilized. The stainless steel reinforced concrete bridge piers had different impact energies, and the impact force time-history, displacement time-history, and strain time-history curves, as well as the crack developing state, were obtained during the testing. The test results showed that the peak values of the impact force, strain, and displacement increased with the increase of the impact energy under the impact load, and the fluctuation frequency also increased. The crack development was mainly concentrated in the lower frontal section of the bridge pier, as well as the middle and lower sections of the back of the bridge pier.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.