Abstract

The 2009 Sumatra, Indonesia earthquake attacked Padang, which is the capital of West Sumatra province, and damaged a large number of reinforced concrete (R/C) buildings. The first author of this paper had conducted a post-earthquake field investigation in Padang. As a result, it was found that one of typical damage to buildings was beam-column joint failure. This damage was caused by poor structural details at joints, nevertheless appropriate details were provided in the Indonesian design regulation. In this study, the structural performance of a typical beam-column joint was experimentally evaluated to investigate the seismic performance of earthquake-damaged buildings. The test results revealed that joint failure occurred prior to beam/column yielding. This means that the actual seismic performance of damaged buildings was less than the design calculations in which joint failure had not been assumed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.