Abstract

In this paper, the output can not meet the operating requirements problems of power plant desulfurization device wet mill system operation, site of the optimization test of wet mill system, optimization and adjustment, wet mill output and fineness of limestone reached or better than the design value, the operation time was shortened, and achieved good economic and social benefits. With reference to the same type of wet overflow type ball mill.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.