Abstract
In this paper, the output can not meet the operating requirements problems of power plant desulfurization device wet mill system operation, site of the optimization test of wet mill system, optimization and adjustment, wet mill output and fineness of limestone reached or better than the design value, the operation time was shortened, and achieved good economic and social benefits. With reference to the same type of wet overflow type ball mill.