Abstract
A study of the thermal desorption of deuterium from 1 µm thick co-deposited Be–(0.1)D layers formed at 330 K by a magnetron sputtering technique is reported. A range of thermal desorption rates 0 ⩽ β ⩽ 1.0 K s−1 are explored with a view to studying the effectiveness of the proposed ITER wall and divertor bake procedure (β = 0 K s−1) to be carried out at 513 and 623 K. Fixed temperature bake durations up to 24 h are examined. The experimental thermal release data are used to validate a model input into the Tritium Migration and Analysis Program (TMAP-7). Good agreement with experiment is observed for a TMAP-7 model incorporating trap populations of activation energies for D release of 0.80 and 0.98 eV, and a dynamically computed surface D atomic to molecular recombination rate.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.