Abstract
The results of dynamical fatigue testing of natural tram track fragment are presented. The fibrous concrete (foundation) was used in track superstructure, the rubber pads “PREFArails” were used for noise and vibration reduction. The cycle testing results analysis demonstrated that “PREFArail” pads ensure the overall structure operability over not less than 25 years without repair. The recommendations for pads and fibrous concrete foundation use on tram tracks in Saint-Petersburg were given.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.