Abstract
Abstract : An experimental roofing installation is described in which polyurethane foam (PUF) was spray-applied directly to metal Butlerib-type metal decks, the roof divided into five approximately equal areas, and the PUF protected with five different elastomeric coating systems. Three of the coating systems were damaged by hailstones about a year after installation; these systems were recoated within 3 years of the initial installation. The current coatings include two of the original coating systems - a plural component silicone and a single component silicone - and those applied over the three systems damaged by hail - a single component silicone, an aluminum filled, hydrocarbon-extended catalyzed urethane, and a catalyzed urethane. The performance of these five PUF systems over a 7-year period is reported. The temperature distributions throughout the roof systems are described. The decay in the thermal conductivity of the PUF roof over a 5-year period is presented, and the energy savings realized by foaming the roof are presented. (Author)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.