Abstract

In northern China, groundwater inrush of Karst collapse pillar (KCP) often affects the coal mining process. Current studies rarely consider the seepage stability of filling materials of KCP, especially through experimental investigations. This study is to quantify the impacts of variable initial porosity and cementing strength on the seepage properties of filling material. For this purpose, we designed and fabricated a test system. This system can offer high water pressure and abundant water flow rate. We tested three types of specimens which were cemented by clay, gypsum, and cement, respectively. The seepage properties were obtained under the initial porosity of 0.11, 0.13, 0.15, and 0.17, respectively. The change mechanism of seepage properties was measured through the comparison between mass loss and mass gain. The results showed the followings findings: (1) The permeability-time curves have two types: the first type is that permeability gradually increases up to the occurrence of seepage instability and the second type is that permeability gradually decreases and approaches to a stable value. No seepage instability is observed. (2) Initial porosity and cementing material significantly affect the water flow properties of filling material. In general, larger initial porosity has larger permeability. For clay as cementing material, seepage instability occurs soon and higher initial porosity has shorter time to reach seepage instability. For gypsum, seepage instability occurs after a period of time when initial porosity is large enough. For cement, the permeability decreases gradually and approaches to a stable value. The permeability-time curves have rapid decrease and slow decrease. (3) The permeability has a magnitude of 10−15–10−13 m2 and varies with initial porosity and cementing materials. The permeability is the largest for clay cementing and is the smallest for cement cementing.

Highlights

  • Karst collapse pillar (KCP) is a kind of geological structures extensively distributed in the North China coalfields

  • For the specimens whose initial porosity is large (0.15 or 0.17), the permeability gradually increases along with obvious fluctuations and the seepage instability occurs after a period of time, which illustrates that the porosity increases and the rate of mass loss ql is larger than that of the mass gain qg

  • It was found that the permeability of the filling material cemented by cement is the minimum and no seepage instability occurs. erefore, cement grouting is an effective method to prevent the water inrush of KCP

Read more

Summary

Introduction

Karst collapse pillar (KCP) is a kind of geological structures extensively distributed in the North China coalfields It is caused by the karst subsidence in carbonate rock [1,2,3]. Zhu and Wei established a damage-based hydromechanical model, and simulated the mininginduced water inrush behaviors after considering the effect of faults and KCP in numerical simulation [9]. Bai et al established the plug model to describe the water seepage flow behaviors in coal seam floor containing KCP [4]. The studies of seepage properties of filling materials of KCP are not extensive in both theoretical and experimental aspects. We developed an experimental study on the filling material in KCP and analyzed its seepage properties in this paper.

Experimental System and Procedure
E S2 D C
Permeability Calculation Based on Darcy’s Law
Discussion
Conclusions