Abstract

Although a significant amount of research has been carried out in the scheduling of flexible manufacturing systems (FMSs), it has generally been focused on developing intelligent scheduling systems. Most of these systems use simple scheduling rules as a part of their decision process. While these scheduling rules have been investigated extensively for a job shop environment, there is little guidance in the literature as to their performance in an FMS environment. This paper attempts to investigate the performances of machine and AGV scheduling rules against the mean flow-time criterion. The scheduling rules are tested under a variety of experimental conditions by using an FMS simulation model.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.