Abstract

Many cities have set ambitious goals regarding the production of renewables within cities using advanced energy planning. The crux of those ambitious plans and goals is to put them into action using different legislative instruments, like a zoning plan. In this article, the experiences of an action research project with the aim to support local urban planners developing a zoning plan that creates favourable conditions for solar energy in Malmö, Sweden, are described. The Swedish planning process, national legal framework and financial conditions for PV systems are described first. Then, different scenarios for optimising the zoning plan were studied, using mainly the economic performance as a key indicator. The results showed that the detailed development plan does create both barriers and drivers for the implementation of PV systems in new buildings. At the same time, it also became clear that the legal and financial framework are equally decisive. By describing the lesson learnt, the method can be applied to other (inter)national contexts.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.