Abstract

This study evaluates the performance of a 1000MW double reheat ultra-supercritical power plant. An exergy analysis was performed to direct the energy loss distribution of this system. Based on the exergy balance equation, together with exergy efficiency, exergy loss coefficient, and exergy loss rate, the exergy distribution and efficiency of the unit were determined. Results show that the highest exergy loss in furnace is as high as 85%, which caused by the combustion of fuel and heat exchange of water wall. The VHP and the two LPs suffer the highest exergy losses, namely 1.86%, 2.04% and 2.13% respectively. The regenerative heating system has an exergy loss rate of 2.3%. The condenser suffers a heat loss of 999MW, but its exergy is as low as 20.49MW. The sensitivity variations of the unit’s exergy efficiency with load, feedwater temperature, main steam temperature and pressure, the twice reheat steam temperatures, and steam exhaust pressure were also analyzed, indicating that load, feedwater temperature, and steam exhaust pressure influence the exergy efficiency of this unit than other elements. The overall exergy efficiency decreases along with the gradual increase of steam exhaust pressure at any constant outlet boiler temperature, but it increases as the load, feedwater temperature, main steam temperature and pressure, and twice reheat steam temperatures increase at fixed steam exhaust pressure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.