Abstract

Setting some projects including surface subsidence, pore water pressure and deep horizontal displacement etc, tracking monitoring soil deformation during construction, and controlling reasonable loading rate are the guarantee of safety and stability of foundation and structure during the construction of south breakwater of industrial park. Monitoring result shows that subsidence and displacement meet the design requirement, with more than 85% of foundation consolidation degree and every controllable parameter index, which achieves stability, safety and informatization construction of breakwater engineering, and guides similar engineering effectively.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.