Abstract

For the purpose of foundation and structure stability during the construction of tide embankment, three monitoring projects including embankment settlement monitoring, berm platform settlement monitoring and pore water pressure monitoring are installed. Integrated monitoring data shows that foundation appears oversize instantaneous settlement on account of high construction speed, short loading interval at initial stage. Following with the shaping of embankment, stable monitoring data range, slow change rate and high dissipation speed of pore water pressure come along. Based on actual embankment settlement data, consolidation degree of soil mass is high and foundation stability becomes strong by means of hyperbolic curve.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.