Abstract
The automatic generation control (AGC) system is temporally situated between economic dispatch and synchronous generator dynamics, and its primary role is to regulate frequency within and tie-line flows between control areas. Given appropriate choice of participation factors (feed-forward controller gains that govern the disaggregation of the area-level power requirement to individual generators), the AGC can be engineered to nudge system dynamics toward a steady-state operating point corresponding to economic optimality. This paper establishes necessary and sufficient conditions under which a widely accepted choice of participation factors guarantees the alignment of steady-state synchronous generator outputs with a global minimum of a prototypical economic dispatch problem. In so doing, it resolves several ambiguities and formalizes technical assumptions governing the role of the standard AGC architecture in the context of economic dispatch and steady-state operation. Numerical case studies tailored to a modified version of the New England 39-bus 10-machine test system validate the theoretical results.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.