Abstract

This paper focused on examining the effect of various factors on budget overrun in construction projects undertaken using management procurement method in Malaysia. It adopted a quantitative method for data collection using structured questionnaire survey amongst contractors, consultant and clients. A total of 118 samples were collected against 200 questionnaires that had been distributed nationwide. Gathered data was analyzed with an advanced multivariate method of structural equation modeling with PLS approach using SmartPLS software. The major finding showed all the constructs in model contributed significantly to budget overrun with R2 value of 0.623. Also, the developed model has substantial explaining power with GoF value of 0.62. This indicates that the model was able to be generalized in representing the budget overrun factors occurring in construction projects nationwide. By identifying these factors, it will help the construction community to take measures in improving the cost performance of the projects.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.