Abstract

Abstract The complex activities for the implementation of renewable energy projects (RES) need a well-documented entrepreneurial plan to find qualified suppliers for the development of RES projects. The activities of the chain links in RES projects, respectively, the transport of heavy components, require a collaborative logistics system to be continually monitored. The requirements stringency imposed for the implementation of wind energy projects inevitably implies infrastructure, implementation and logistical constraints. Special parts of the wind turbine can be difficult to handle due to their fragility, weight or size and therefore it requires special treatment when transported. This work, based on the Analytic Hierarchy Process (AHP) method, respectively through a decision model provides an entrepreneurial plan for the intermodal transport needed to assembly a wind turbine in isolated regime, where there are challenges related to the high transport distance, low road standard and rough climate.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.