Abstract

In this study, we consider the joint problem of preventive replacement and spare parts inventory planning. We present an exact dynamic programming formulation to minimize the total expected cost over a finite planning horizon. As it is not possible to represent the optimal solution by a well-defined and practical policy, and the dynamic programming recursion is time-consuming to apply, we propose three heuristic approaches that are easy to understand and to implement in practice: (i) Steady-State Approximation, (ii) Stationary Policy and (iii) Myopic Approach. Through computational analyses, we investigate the effects of the model parameters on the performances of the proposed heuristics.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.