Abstract

Reliance Gas Transportation Infrastructure Limited (RGTIL) is operating its prestigious East-West Gas pipeline (EWPL), since 2008–2009; project comprising of 48” dia. 1375 km long trunk pipeline, with 11 nos of compressor stations and several spur lines of different diameters varying from 10” to 30”. Cathodic Protection (CP) system for buried pipeline, piping and structures is critical for ensuring protection against external corrosion due to environmental interaction. For successful implementation of CP system from day one of pipeline laying; planning and considerations starts at conceptual stage of project itself, then proper planning, design and implementation to follow. Other than considerable length and diameter of pipeline; uniqueness for EWPL CP requirements are in form of 3 nos. Micro-tunnel crossings, 11 nos of Compressor stations (CS) with underground piping, more than 100 cased crossings, several HDD, third-party pipelines, AC & DC Railway traction crossings and pipeline passing through different geography from East to West. Paper discusses the implementation of CP system for EWPL; highlighting critical points for execution of the job in each phase from Engineering till commissioning and O&M, CS CP system, CP for pipe within Micro-tunnelling, several interference and mitigation actions, post-commissioning surveys etc.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.