Abstract

Flow time of semiconductor manufacturing factory is highly related to the shop floor status; however, the processes are highly complicated and involve more than 100 production steps. Therefore, a simulation model with the production process of a real wafer fab located in Hsin-Chu Science-based Park of Taiwan is built for further studying of the relationship between the flow time and the various input variables. In this research, a hybrid approach by combining Self-Organizing Map (SOM) and Case-Based Reasoning (CBR) for flow time prediction in semiconductor manufacturing factory is developed. And Genetic Algorithm (GA) is applied to fine-tune the weights of features in the CBR model. The flow time and related shop floor status are collected and fed into the SOM for clustering. Then, a corresponding SGA-CBR method is selected and applied for flow time prediction. Finally, using the simulated data, the effectiveness of the proposed method (SGA-CBR) is shown by comparing with other approaches.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.