Abstract
Introduction: The hospital is a place that is quite prone to fire hazards. Ernaldi Bahar has various characteristics of activities that have the potential to cause fires such as medical and administrative activities that use electrical installations as well as the use of intensive fire sources in kitchens, laundry or generator rooms as well as the presence of relatively high burning materials sourced from various medicines, chemicals, LPG gas cylinders and oxygen. The purpose of the research is to evaluate the implementation of active fire protection system at Ernaldi Bahar. Methods: This study uses qualitative methods with observational approaches, interviews and document studies. Result: The results showed that the active fire protection system at Ernaldi Bahar Hospital is well categorized with a percentage of 69% value with the results of fire alarm analysis based on Kepmen PU No.10 Year 2000, NFPA 72 and SNI 03-3985-2000 (81%), fire detector analysis based on NFPA 2000 and SNI 03-3985-2000 (100%), apar analysis based on NFPA 10 (89%), building hydrant analysis based on Permen PU No.26 Year 2008 and SNI 03-1745-2000 (73%), analysis of page hydrants based on Permen PU No.26 Year 2008 and SNI 03-1745-2000 (73%), and Sprinkler analysis based on SNI 03-3989-2000 (0%). Conclusion: Active fire protection system has been implemented well with a percentage of 69% value but it need some improvement in maintenance, placement, recording and completeness of active fire protection system components. Keywords: Hospital, Fire, Active Fire Protection System
Highlights
The hospital is a place that is quite prone to fire hazards
Result: The results showed that the active fire protection system at Ernaldi Bahar Hospital is very well categorized with a percentage of 69% value with the results of fire alarm analysis based on Kepmen PU No.10 2000, NFPA 72 and SNI 03-3985-2000 (81%), fire detector analysis based on NFPA 2000 and SNI 03-3985-2000 (100%), fire extinguisher analysis based on NFPA 10 (89%), building hydrant analysis based on Permen PU No.26 2008 and SNI 03-1745-2000 (73%), analysis of yard hydrants based on Permen PU No.26 2008 and SNI 03-1745-2000 (72%), and sprinkler analysis based on SNI 03-3989-2000 (0%)
SNI 03-1745-2000 Tata Cara Perencanaan dan Pemasangan Sistem Pipa Tegak dan Slang untuk Pencegahan Bahaya Kebakaran pada Bangunan Rumah dan Gedung
Summary
Titi Nurhaliza[1], Desheila Andarini1*, Poppy Fujianti[1], Dwi Septiawati[1], Mona Lestari[1]
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.