Abstract
To determine design reliability, this study paper evaluates the design process of commercial construction projects. To streamline design efforts, decrease needless design errors, and boost design reliability, a new design workflow will be developed using commercial building concepts. The suggested procedures will give team members input on the state of the design and enable ongoing development. One of the pioneering applications of the lean methodology to building project design will be the proposed processes. Labour overruns, inadequate monitoring, and control, a lack of competence on the part of the contractor's key staff, poor planning or scheduling, and poor planning and monitoring of the refurbishment project were the top 5 variables influencing the commercial construction design process.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: World Journal of Advanced Engineering Technology and Sciences
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.