Abstract

Within the scope of the Ankara-Istanbul High Speed Train Project, the T29 tunnel was opened to traffic after completing excavation and support implementation. The tunnel was excavated in weak to very weak graphitic schists causing severe face stability problems and deformations on the tunnel supports during excavation stage. In the progress of the excavation stage, a serious face failure occurred at Km: 225 + 784, and the effects of this face failure were observed on the surface. Since the cover thickness is approximately 35 m in this section of the tunnel, it was decided to pass this zone with a cut and cover structure. The portal excavation was carried out from the failure zone, and it was planned to provide stability with the closure of the surface by constructing a cut-and-cover structure immediately afterwards. However, slope failures occurred during the portal excavations. This section was reworked, and it was decided to support this area with a pile system. Consequently, in this study, the reasons for the face failure and slope failures are investigated, and the construction stages are explained and discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.