Abstract

In order to solve the problems of unreasonable allocation and low efficiency of emergency rescue resources in coal mine accidents, it is necessary to establish a coal mine emergency rescue resource allocation model by using comprehensive weight-approximation ideal solution (TOPSIS method).This paper takes rock burst in a coal mine as an example by extending this designed emergency rescue plan. Firstly, calculated the weight of the evaluation index affecting the emergency rescue is selected by AHP method and entropy weight method respectively. Then weight optimization is inspired by comprehensive weight method. Finally, the optimal scheme is selected by TOPSIS method, and the model is verified by AHP method approaching ideal solution and entropy weight method approaching ideal solution. The results shows that: (1) There are two influencing factors have great effect on the evaluation of coal mine emergency rescue model, which are rescue time and advance of rescue channel; (2) The optimal scheme is program 5 through comprehensive weight approaching ideal solution, which is consistent with the actual situation of the project, indicating that the model has high reliability.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call