Abstract
Being nodes of intermodal transport network, the railway container terminals need to make efficient plans over transshipment operation to guarantee punctuality of the whole transport network. This paper takes multimodal freight that needs to be repacked as the object of study. It looks into the main factors that cause freight delay through investigation of multimodal freight delay phenomenon during transshipment operation in railway container terminals. Combining the practical requirement of transshipment operation of multimodal freight, an evaluation index system of transshipment and repacking solutions in railway container terminals is proposed. This evaluation index system can be used to range the work of loading and reloading containers for further improvement.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.