Abstract

In order to realize the goal of “building up mobile homestays among lucid waters and lush mountains”, the Mentougou District of Beijing wants to plan the surrounding area with the theme of “One Line and Four Mines” in the west of Beijing. In order to comply with the requirement of “one station, one scene”, 12 railway stations need to be planned and developed in different directions, So the station development needs to be evaluated and analyzed first. In this study, the entropy weight method and the TOPSIS (technique for order preference by similarity to an ideal solution) method are comprehensively used to establish indicators from five aspects: natural potential, mining heritage potential, social potential, traffic potential and tourism potential, and to evaluate the development decision of 12 railway stations of the Menda Railway. The tourism development direction and development importance of abandoned railway stations are decided from the horizontal and vertical dimensions, and the results of the TOPSIS model are expanded beyond the numerical value itself. On this basis, this study also combined with the existing situation of each site, and gave suggestions on the development planning of each site.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.