Abstract

Congestion management in restructured power system is a major technical challenge for the power system engineers. For a congestion free power market , Available transfer capability(ATC) is to be enhanced. ATC is a measure of remaining MW transaction that can be carried out without violating the transmission limits. In deregulated market , change in load can be met by more than one generator of the system generator participation factor is a measure of amount of power contributed by the generator to satisfy the load.This paper proposes that in simultaneous power transaction generator participation factor can decide the ATC of the network and can also change the maximum amount of load sustained by the bus before causing congestion of the network For this coding is done in MATLB and results are verified on Power world Simulator software.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.