Abstract

Alexandria landfill site in El Hammam operated by Onyx since 2003 has been used as an Egyptian landfill case study. Methane generation rates have been estimated using three different simulation models namely: LandGEM, E-PLUS, and the 2006 IPCC Waste Model. The models were run using actual waste quantities disposed at this site together with projected waste quantities till the closure of the landfill site. Power consumption becomes economically feasible only if electricity price is increased locally.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.