Abstract

A reservoir operation planning using Data driven Techniques is gaining its momentum in hydrological area with good prediction and Estimation capabilities. The present work aims at using the 5 years data of Water Level to estimate the discharge and water level at the Yedgaon dam which is like pick up weir having its own yield and storage. It receives water from Dimbhe (though DLBC), Wadaj (through MLBC), Manikdoh (through river) and through Pimpalgaojoge (through river), in the Kukadi project of Maharashtra State, India. 4 different models were developed to estimate the water level using the Data Driven Techniques: M5 Model Tree, Support Vector Regression, Multi Gene Genetic Programming and Random Forest. The Accuracy of the developed models is assessed by the values of coefficient of correlation, coefficient of efficiency, mean absolute error and root mean squared error and comparison is done between actual values and Predicted values. The results indicated that the MGGP model was superior as compared to other techniques with correlation coefficient as 0.86 with an advantage of a single equation to estimate the water level.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.