Abstract
ABSTRACT In this article, authors attempt to estimate the volume of rock pieces using the laser scanning technique supported by measurements from the RGB camera. Laboratory tests were performed, based on which the error in estimating the size of the fragments was determined based on the available perspectives. With a known estimation error, the volume of the ore chunks was estimated based on data from a single perspective. The presented methodology makes it possible to determine a unital numerical measure to compare Hydraulic Breaker Hammers (HBH) and Lekatech Electric Hammer (LEH) by estimating the energy consumption determined through electric current measurements.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Mining, Reclamation and Environment
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.