Abstract
The purpose of this work is to establish the regime of methane releases (explosive gas) following the execution of the underpass works of the Sibiu-Pitesti highway in the Curtea de Argeș-Pitesti sector. INSEMEX Petroșani executed during the period 01-04.11.2022 on-site measurements at four highway underpasses with a total length of 843m as well as in the areas adjacent to these underpasses, noting that these underpasses are from wells in operation and are connected to the SRM Merișani Station. Based on the measurements and observations made, the analysis of the elements taken into study, as well as the existing records and documentation, INSEMEX Petroșani made the present work.