Abstract
Min-max routing problems aim to minimize the maximum tour length among multiple agents as they collaboratively visit all cities, i.e., the completion time. These problems include impactful real-world applications but are known as NP-hard. Existing methods are facing challenges, particularly in large-scale problems that require the coordination of numerous agents to cover thousands of cities. This paper proposes Equity-Transformer to solve large-scale min-max routing problems. First, we model min-max routing problems into sequential planning, reducing the complexity and enabling the use of a powerful Transformer architecture. Second, we propose key inductive biases that ensure equitable workload distribution among agents. The effectiveness of Equity-Transformer is demonstrated through its superior performance in two representative min-max routing tasks: the min-max multi-agent traveling salesman problem (min-max mTSP) and the min-max multi-agent pick-up and delivery problem (min-max mPDP). Notably, our method achieves significant reductions of runtime, approximately 335 times, and cost values of about 53% compared to a competitive heuristic (LKH3) in the case of 100 vehicles with 1,000 cities of mTSP. We provide reproducible source code: https://github.com/kaist-silab/equity-transformer.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Proceedings of the AAAI Conference on Artificial Intelligence
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.