Abstract

The construction of a modern mountain hut nearthe mountains Matterhorn and Dufourspitze in the Swiss Alps is investigated from an environmental point of view. A prospective environmental assessment was performed to minimize the environmental impact already in the planning phase of the new building; construction will start in autumn 2008. An energy balance of the existing hut was made to detect optimization potentials and to predict the necessary energy generating systems of the new building. In addition to energy supply, the environmental impacts of materials and processes were compared and evaluated with the help of Life Cycle Assessment Although energy use will increase in the new building, mainly due to the installation of a wastewater purification system, total greenhouse gas emissions will decrease.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.