Abstract
Abstract. Repair and reconstruction of existing ce-ment-concrete pavements of hard pavements should be performed based on the results of the assessment of the condition of the pavement, assessment of their suitability as a basis for new layers and especially when reinforced with asphalt concrete layers. The article presents a method of determining the actual total modulus of elasticity of pavement, using static and dynamic stamping equipment and evaluating the results of measuring the modulus of deformation and elasticity of the concrete base at different passes of the vibrating cavity to decide on the method of re-pair. It is concluded that with a weak base, the vibroresonance method is unsuitable and stress relief should be used with a minimum number of passes of destructive equipment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Bulletin of Kharkov National Automobile and Highway University
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.