Abstract

This paper introduces new contributions for construction procedures designed to enhance the robustness and precision of stress control in active anchorage and short presetressing units for long-span bridges, particularly addressing potential technical risks. The primary focus is on optimizing stress management for bridge stays, suspension cables, and short prestressing units by emphasizing a unified parameter: stress. The contributions of this research encompass (1) the introduction of advanced load cells for stress control in active anchorages and (2) the implementation of a novel synchronized multi-strain gage load cell network for short prestressing units, crucial in situations where prestressing losses can attain significant magnitudes. To validate these advancements, the authors present (3) a practical experience and results obtained from applying these methodologies in monitoring the structural response during the construction of the Tajo Bridge using the cable-stayed cantilever technique.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.