Abstract

Autonomous factories require high levels of adaptability, flexibility, and resilience to react to uncertainties on the shop floor, such as machine downtime. This paper proposes a negotiation-based, partial rescheduling method, combined with an existing multi-agent system, to swap jobs between machines. The negotiations are restricted to machines within the same work center, giving rise to a partial reschedule. A learning algorithm is also utilized, allowing machines to individually learn how to evaluate proposed bids from other machines and adapt the bids to their current environment. The main objective is to minimize the mean weighted tardiness of all jobs. Computational results indicate an improvement of 10–30 tardiness, compared to continuous rescheduling and complete rescheduling methods. In addition, a decrease of 70–80 sensitivity analysis and analysis of the partial reschedule.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.