Abstract

Hydrocarbon exploration in Angola commenced in 1910 with its first oil recovered in 1955. The proven reserves in Angola are estimated to reach up to 13 billion barrels (2.1 billion m3). Most of the Angolan oil fields are mature or maturing and some are or may be abandoned due to unprofitable recovery limit beyond the conventional type of oil production. The oil recovery is mainly by primary and secondary recovery methods. Apart from the issue of maturity, there is increasing energy demand due to population growth and difficulties in discovering and developing new fields as alternatives to the current oil fields. For incremental and sustained production rate of these fields and in addition to instability of oil prices and concerns about future oil supply, Angola has started to work towards developing affordable and efficient technologies capable of recovering residual oil in reservoirs as well as extend the life of many current fields which can be achieved through the implementation of enhanced oil recovery (EOR). Therefore, this paper discusses the EOR planning strategy from project selection, project implementation and optimization, and field abandonment. It further highlights the mutual benefits that may be derived from a cross-collaboration between the government and other stakeholders in Angola.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.