Abstract

This paper presents an enhanced migrating bird optimization (MBO) algorithm and a new heuristic for solving a scheduling problem. The proposed approaches are applied to a permutation flowshop with sequence dependent setup times and the objective of minimizing the makespan. In order to augment the MBOs intensification capacity, an original problem specific heuristic is introduced. An adapted neighborhood, a tabu list, a restart mechanism and an original process for selecting a new leader also improved the MBO’s behavior. Using benchmarks from the literature, the resulting enhanced MBO (EMBO) gives state-of-the-art results when compared with other algorithms reference. A statistical analysis of the numerical experiments confirms the relative efficiency and effectiveness of both EMBO and the new heuristic.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call