Abstract

Summary Underground gas storage (UGS) is an important segment in China's gas market. Because of the supply-and-demand misbalance of natural gas, the gas in underground storage is made available during the peak winter season. In the west of China, the Hutubi dry-gas field is to be used for UGS with a storage capacity of 4.5 × 109 m3. A total of 37 wells will be drilled with 30 natural-gas-injection/-withdrawal wells, five observation wells, and two water-injection wells. UGS relies on proper wellbore construction and the sealing function of the caprock. The selection of the type of cement is crucial to having a healthy well that will last to meet the gas-storage need of 30 years under high-intensity injection. The gas injection and withdrawal will induce different stresses on the cement sheath and may destroy the seal by either debonding (microannulus) or cracking; an effective cement system is required to prevent the leakage of the gas and flow through the caprock. A specialized cement technology was identified as a solution to UGS and was deployed successfully in the Hutubi field with good results. The cement selected had to meet the pressure and temperature challenges associated with UGS, and a methodology was established to qualify the new sealant. Case histories of three wells illustrate the steps taken in cementing UGS wells in the field.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call