Abstract
The rapid development of wind power has imposed many challenges on the operation of the power system. Energy storage system has broad application prospects in promoting wind power to the grid. However, the high price of the energy storage restricts the development of the combined wind energy-storage system. In order to deal with the power fluctuation of the large-scale wind power grid connection, we propose an allocation strategy of energy storage capacity for combined wind-storage system considering the wind power output volatility and battery storage system’s own operational constraints. The model aims to maximize the annual avenue of the cogeneration system, which allows for the investment fee, operation and maintenance fee and penalty cost of the combined system. The calculation results validate the effectiveness of the optimal allocation strategy.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.